This Project to modernize the historic Inchon Rifle Range at the Marine Corps Recruit Depot Parris Island completely demolished the existing 50-lane firing range and constructed a new impact berm, side safety berm, paved firing lines and roads, and storm water collection and management systems. We performed as a subcontractor to the Prime Contractor to install rebar in the concrete wall and foundation installed along the entire length of the Rifle Range that serves as the new, side safety berm as well as the walls constructed around the target impact area.
Period of Performance: FY 2018
Period of Construction: Jan 2018 – May 2018
Project Fee: N/A
Construction Cost: N/A
Prime Contractor: R.C. Construction Co., Inc.